I am so pleased at the work that our contractor has done and am excited to move into our new home!
The final color! We still have one set of shutters that need to be hung and the shutters that are hung need to be taken down and redone so that the top of the shutter is level with the bottom of the trim. Also the front door is the original green color. We are going to replace the front door and it will be stained once it is installed instead of painting it.
The concrete was poured for the front sidewalk and this week brown pavers will be laid over top of them and will continue up the stairs. Once this is done the railings will be installed on either side of the steps.
Our back patio! They are going to go in and cut out a design in the concrete and then we are going to add an acid stain.
The living room was dry walled and we tested out some paint options.
The kitchen was dry walled and is ready for the new cabinets.
The hallway leading to our master bedroom was dry walled.
The new closet in the upstairs bedroom.
The doorways were framed in that use to lead to the powder room and master bedroom.
We spent the weekend in Atlanta with our good friends Joe, Becca, Michael, and Holly. Joe and Becca have a beautiful new home and live in a great neighborhood in Atlanta, congrats! Michael and Holly will be getting married in 20 days, we are so excited for you guys!
Holly was the skee ball champ of the night!